RUMS·FLOOR POC

Final Assembly

TARGET 8000 CURRENT 5168 OEE 66% WIP 502
EQUIPMENTPRODUCT
FLOOR
ISOTOP FRONTEND
DAILYWEEKLYMONTHLYHISTORIC
ACTIVE ISSUE QUALITY MATERIALS MAINT ATTENDED DOWN

SIMULATION · NT1 LINE

MIRA cycle 45s
Predicted UPH

mira_02

ISSUE JOB NT2B – MRP 8779543
SHIFT PASS 347 SHIFT FAIL 12 YIELD 96.7% UPH 41

Operator flavor: station-locked kiosk. No floor navigation. P = pass · F = fail. This is the same console the kiosk PWA ships.